Files
HealthLog/.planning
Marc-André BombeckandClaude Opus 4.7 210f6105a7 chore(planning): phase 2 done — v1.4.6 deferred backlog cleared
T2.1 / T2.2 / T2.3 / T2.5 landed as atomic commits 512a6a6, cb6a59a,
5403821, d6696cf. T2.4 / T2.6 / T2.7 deferred to phase 4b (admin
refactor to per-section dynamic routes makes anchor-id work
disposable).

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-05-09 16:08:20 +02:00
..