Commit Graph
7 Commits
Author SHA1 Message Date
Marc-André Bombeck 08d3cd2c31 Split the ECG cap and one provenance entry off their label maps
The /insights overview crept a kilobyte over its ceiling: the ECG
teaser imported its overview cap from the classification module, which
dragged that module's label map and helpers into the eager page, and
the Health Score card pulled the whole metric-provenance map for its
one citation. The cap now lives in a value-only module and the single
provenance entry is split out, so the overview imports the bare number
and citation it renders. Both routes are back under budget. The
aggregate ceiling rises to hold the six-locale copy the new encounter,
mood-context, mood-prognosis and practitioner surfaces added, which the
whole-build sum counts independently and no single route downloads.
2026-08-08 17:56:40 +02:00
Marc-André Bombeck b85a348891 Give the type check the same memory ceiling the build already has
CI died at the 4 GB default heap while checking types. The build was given its
own ceiling earlier this month so a local run, CI and the published image all
invoke it the same way; the type check was left on the default and has now grown
past it. Same treatment, same reason.

Also raises the aggregate bundle cap from 3260 to 3310 KB, and only that one.
Every per-route ceiling is untouched and every measured route sits within a
kilobyte of its previous value, so nothing a person downloads grew. The rise is
the new score-settings route, a mutually exclusive chunk that the whole-build sum
counts even though no single visit pays for it, plus its strings across six
locales. The reasoning is recorded in the budget file beside the number.
2026-07-31 22:08:05 +02:00
Marc-André Bombeck f54555d187 fix(build): stabilize release bundle gates 2026-07-29 16:19:30 +02:00
Marc-André Bombeck 1d784c6367 fix(analytics,ci): merge health-score meta annotations, migrate integration tests, remove dead exports, raise bundle budget 2026-07-28 23:02:00 +02:00
Marc-André Bombeck 24d699f252 chore(bundle): re-measure the client budget for the surfaces this release adds 2026-07-26 18:26:45 +02:00
Marc-André Bombeck 62eb431d66 release: v1.32.0 — hardening and scalability (#580)
* release: prepare v1.32.0

* test: stabilize water capture re-entry
2026-07-22 04:14:15 +02:00
Marc-André Bombeck cb9d61a311 perf(dashboard): server-prefetch the snapshot into the first HTML + bundle budget gate
The measured first-load gap on / was never the server: FCP painted the
SSR shell at ~1.8 s but LCP landed at ~5.5 s (mobile-throttled) because
the tiles waited for JS download + hydrate + a CLIENT-side snapshot
fetch — while /api/dashboard/snapshot answers in ~8 ms server-side.

src/app/page.tsx is now a thin RSC wrapper: it runs the same cached
snapshot read the API route uses (extracted to
src/lib/dashboard/snapshot-read.ts, one shared SWR cell for both
readers) and hands the result to TanStack via HydrationBoundary +
dehydrate, so the first HTML carries real tile data and the mounted
cell starts warm (staleTime 60 s, refetchOnMount false — no double
fetch). Query keys come only from the central factory
(dashboardSnapshot(locale) + the dashboardWidgets seed the client cell
already performs); the payload is JSON-round-tripped so the hydrated
shape is byte-equal to the wire shape. Fail-soft: no session or any
builder error renders the page exactly as before. The 1,727-line client
page moves unchanged to src/app/page-client.tsx; no component-tree
rewrite.

Companion: the documented bundle tooling was dead on Turbopack
(ANALYZE=1 silent no-op, bundle-report read a webpack-only JSON), so
H2/H3-class regressions shipped invisibly. scripts/check-bundle-budget.mjs
derives per-route gzip totals from the Turbopack client-reference
manifests + rootMainFiles, prints the report (pnpm bundle-report), and
enforces bundle-budget.json (pnpm bundle-check): per-route caps,
total-client-JS cap, a recharts-duplication guard (fingerprint count
must stay 1), and a catalog guard (no message catalog referenced by any
route manifest). Wired into the existing e2e workflow after next build.

H4
2026-07-07 12:51:18 +02:00