Files
HealthLog/.planning/ROADMAP.md
T
Marc-André BombeckandClaude Opus 4.7 6b88e56aeb chore(format): prettier sweep over phase-2 touched files + stale planning docs
Picks up the prettier line-wraps the v1.5 phase-1 planning docs and
codex-protocol-spec.md missed, and brings the redact.ts + insights
generate route test into the project's standard form. No behaviour
change — pnpm format:check now passes clean.

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-05-09 16:06:52 +02:00

2.8 KiB
Raw Blame History

HealthLog v1.5 — roadmap

Milestone: v1.5.0 (overnight 2026-05-09 → 2026-05-10) Latest tag at start: v1.4.13 (Codex-OAuth model slug gpt-5 patch)

Phase Goal State
0 Bootstrap — STATE+ROADMAP, git/CI/prod sanity, single chore commit done
1 Verify Codex-OAuth end-to-end (device-start shape, prod logs, gpt-5 slug) pending
2 v1.4.6 deferred backlog — T2.1..T2.7 (wipe scope, DST math, 5xx → 422/503, status-card test, redact regex, Backups view, /admin/users) pending
3 End-to-end test coverage — authed dashboard, add-measurement, KI flow, doctor PDF, insights, mobile smoke, axe-core extended pending
4 Performance audit — Playwright capture, docs/audit/v15-performance.md, top-3 wins inline pending
4b Admin Panel refactor — /admin/[section] dynamic routes mirror Settings; sidebar Admin group; legacy hash redirects; bundle-size win pending
5 UX polish — design-review top-10 friction points, CRITICAL/HIGH triage pending
6 Multi-agent QA (parallel) — code-reviewer, security, visual/UX, simplify pending
7 Pre-release verification — typecheck / lint / format / test / integration / build / e2e pending
8 Release v1.5.0 — bump, CHANGELOG, tag, GHCR, Coolify force-pull, /api/version=1.5.0, smoke screenshots pending
9 Docs + landing site sync to v1.5 pending
10 Backfill GitHub releases v1.4.7..v1.4.13 from CHANGELOG pending
11 Final summary docs/audit/v15-summary.md with Marc-Brief pending

Stop conditions: production red, large un-spec'd issue, context cutoff, or budget short of polish — write status doc, do not auto-rollback.

Time-runs-short minimum to ship v1.5.0: Phase 1 + Phase 2 + Phase 7 + Phase 8. Phases 3–6 + 9 are deferrable to v1.5.1.

Spec: /Users/marc/infra/prompts/v15-night-marathon.md (orchestrator prompt, every phase, every gate).