mirror of
https://github.com/MBombeck/HealthLog.git
synced 2026-11-10 13:22:14 +00:00
The single job passed at about eighteen minutes against a twenty-minute cap, and the settings geometry measurements pushed it over, so the run died at the timeout with everything to that point green. Same remedy as the integration suite, split rather than raise: two Playwright shards, each with its own database and production build, and a gate job carrying the exact name branch protection requires that fails when any shard failed or was cancelled.