Files
HealthLog/.planning/ROADMAP.md
T
Marc-André BombeckandClaude Opus 4.7 cc395d3937 chore(planning): bootstrap v1.4.15 marathon
Pivot STATE.md + ROADMAP.md from the completed v1.4.14 marathon (live in
prod at /api/version=1.4.14, image digest 0ced46004a54) to the v1.4.15
scaffold: phases A1-A5 (quick fixes), B1-B6 (bigger features), C1-C5
(hardening including AI/Codex hallucination-resistance and Coolify
auto-deploy), D (multi-agent QA), E (release).

v1.4.14 entries archived in-place; docs/audit/v1414-summary.md remains
the canonical release record. Phase-0 report at
.planning/phase-0-report.md.

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-05-09 20:08:36 +02:00

5.4 KiB

HealthLog v1.4.15 — roadmap

Milestone: v1.4.15 (kicked off 2026-05-09) Latest tag at start: v1.4.14 (live in prod, image digest 0ced46004a54…)

Phase Goal State
0 Bootstrap — STATE+ROADMAP for v1.4.15, git/CI sanity, single chore commit done
A1 Nav conditionals + sidebar context-awareness (bug-report toggle, skip-link, admin sub-items) pending
A2 /admin overview redesign + /admin/api-tokens responsive table pending
A3 Quick-add labels disambiguation + Stimmung-Card mobile fix + onboarding flicker pending
A4 Dashboard analytics fixes (BD-Zielbereich 0%, Medikamente graph, Stimmung agg, 7-Tage-Trend) pending
A5 Mobile UX audit + chart scroll-lockup fix pending
B1 Backup completeness — restore, download, upload, audit, docs pending
B2 Withings + moodLog sync robustness — status UI, refresh rotation, telegram on fail, audit pending
B3 Notification reliability — auto-disable on 410, exp backoff, status visible pending
B4 Achievements UI — surface in dashboard or dedicated page, unlocked-at timestamp pending
B5 Onboarding tour first-run — welcome flow after passkey registration, skippable pending
B6 Doctor-report v2 — configurable date range, practice-name on cover pending
C1 AI/Codex hardening — provider abstraction, JSON-schema, citations, scope, slug-drift defense pending
C2 Auto-deployment — Coolify webhook on GHCR push, failure-notify, self-tested via next release pending
C3 CI/e2e reliability audit — root-cause flaky specs, ensure docker-publish always builds pending
C4 i18n coverage audit — admin.section.<slug>.* EN+DE parity AND non-empty test guards pending
C5 Empty-states audit — /admin/users, /admin/backups, dashboard for very-new users pending
D Multi-agent QA (parallel, write-only) — code-review, security, design, senior-dev, simplify pending
E Release v1.4.15 — bump, CHANGELOG, tag, GHCR, auto-deploy via C2, /api/version=1.4.15, smoke pending

Stop conditions: production red, large un-spec'd issue, context cutoff, or budget short of polish — write status doc, do not auto-rollback.

Time-runs-short minimum to ship v1.4.15: Phase A (any subset) + Phase D

  • Phase E. Phases B1-B6 + C1-C5 are deferrable to v1.4.16 if context budget tightens.

Phase 0 spec for this marathon: orchestrator user message in this session (not stored to disk).


Previous milestone — v1.5 (relabelled v1.4.14, completed 2026-05-09)

Phase Goal State
0 Bootstrap — STATE+ROADMAP, git/CI/prod sanity, single chore commit done
1 Verify Codex-OAuth end-to-end (device-start shape, prod logs, gpt-5.3-codex slug) done
2 v1.4.6 deferred backlog — T2.1..T2.7 (wipe scope, DST math, 5xx → 422/503, status-card test, redact regex, Backups view, /admin/users) done
3 End-to-end test coverage — authed dashboard, add-measurement, KI flow, doctor PDF, insights, mobile smoke, axe-core extended done
4 Performance audit — Playwright capture, docs/audit/v15-performance.md, top-3 wins inline done
4b Admin Panel refactor — /admin/[section] dynamic routes mirror Settings; sidebar Admin group; legacy hash redirects; bundle-size win done
5 UX polish — design-review top-10 friction points, CRITICAL/HIGH triage done
6 Multi-agent QA (parallel) — code-reviewer, security, visual/UX, simplify done
7 Pre-release verification — typecheck / lint / format / test / integration / build / e2e done
8 Release v1.4.14 — rebrand patch deploy (host-side retag, GHCR :1.4.14, image digest 0ced46004a54…) done
9 Docs + landing site sync to v1.4.14 done
10 Backfill GitHub releases v1.4.7..v1.4.13 from CHANGELOG done
11 Final summary docs/audit/v1414-summary.md with Marc-Brief done

Marathon completed 2026-05-09T18:35+02:00 — v1.4.14 LIVE in prod. Full report: docs/audit/v1414-summary.md.