Files
HealthLog/.planning
Marc-André BombeckandClaude Opus 4.7 2c488b830c chore(planning): bootstrap v1.5 marathon
Reset .planning/STATE.md and .planning/ROADMAP.md for the v1.5
overnight marathon. STATE.md tracks 12 phases (0–11) with empty
checkboxes; phase 0 marked done. Capture phase-0 sanity report at
.planning/phase-0-report.md (git status clean, recent commits, CI
status, /api/version=1.4.12 — one tag behind HEAD because the
v1.4.13 GHCR build is still in_progress; phase 1 owns the force-pull
verification). ROADMAP.md condenses the 12-phase plan with the
time-runs-short minimum (1+2+7+8) for shipping v1.5.0.

Previous milestone (v1.4.6) summary preserved as a one-line link to
docs/audit/v146-summary.md at the top of STATE.md.

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-05-09 15:23:34 +02:00
..